<%@LANGUAGE="VBSCRIPT"%> Putah Creek Stage and Flow at Headworks

Putah Creek at Headworks

All of the data and information on these plots is raw, unrefined, and has not yet been reviewed by qualified staff. The plots come directly from the monitoring equipment and are displayed in unedited format. All monitoring equipment is subject to intermittent fluctuations, or spikes, which can cause invalid readings. These plots are issued periodically throughout the day and may not reflect current readings. The data and information is subject to change at any time for a variety of reasons.

All times are Pacific Standard.
Add one hour during daylight savings time (if the plot says 15:00, the real time is 16:00)
Rating curves are maintained up to 100 cubic feet per second (cfs), any flows above it are not accurate.
.

  Headworks Putah Creek Flow

 

Date/Time Flow (cfs)

These mean daily releases shall be measured at the Putah Diversion Dam and made from the Putah Diversion Dam into lower Putah Creek immediately downstream of the Putah Diversion Dam.

Copyright ©2008 Solano County Water Agency, All Rights Reserved